![](https://pyramidbuildersltd.co.uk/wp-content/uploads/2019/08/newlands-school-i101013-r3-1.jpg)
Newlands School
1st August 2019![](https://pyramidbuildersltd.co.uk/wp-content/uploads/2019/08/Notre_Dame_School_TomCronin_IMG_5168.jpg)
Notre Dame School
1st August 2019St Saviour’s & St Olave’s School
![](https://pyramidbuildersltd.co.uk/wp-content/uploads/2019/08/1721536_AOC-Saviour-Olave-ent-2-web-1200x675.jpg)
Project: | St Saviour’s & St Olave’s School |
Client: | London Borough of Southwark |
Contractor: | Balfour Beatty Education |
Package Value: | £200,000 |
Architect: | AOC Architecture |
Year: | 2012 |
St Saviour’s & St Olave’s is a Church of England secondary school for girls located near Elephant & Castle.
The school serves a varied and mixed community and the design met the school’s desire for a fully inclusive and accessible building. Originally built facing the south, the campus was required to evolve its orientation to the north and a new building was built to provide a new public street entrance.
Pyramid Builders carried out the extension works with careful consideration of the logistical realities of construction allowing the school to remain fully operational throughout the build.